Wall formwork is perfect for weighty and light duty versatile formwork and is appropriate for vast kind of cast – in situ concrete construction such as walls, adequately stiffened with longitudinal stiffener, foundation, Rectangular or circular tanks, Dams, Bridges, beams, column, etc. Made out of 12G10G, MS sheet with 45mm 50mm deep Angle frame.
Wall formwork is perfect for weighty and light duty versatile formwork and is appropriate for vast kind of cast – in situ concrete construction such as walls, adequately stiffened with longitudinal stiffener, foundation, Rectangular or circular tanks, Dams, Bridges, beams, column, etc. Made out of 12G10G, MS sheet with 45mm 50mm deep Angle frame.
A one portion freight bearing coupler for between any two & scaffold tubes at some through 360° . press from elevated status steel and check for distortion & slip.
A one portion freight bearing coupler for between any two & scaffold tubes at some through 360° . press from elevated status steel and check for distortion & slip.
Consists of rigid welded border make out of 48.3 OD pipe in two plumb and two horizontals. The frames are connected by scissor (Cross) Braces made out of 25 NB NB pipes via the pin welded on frame and secure in spot care of clips.
Consists of rigid welded border make out of 48.3 OD pipe in two plumb and two horizontals. The frames are connected by scissor (Cross) Braces made out of 25 NB NB pipes via the pin welded on frame and secure in spot care of clips.
PLOY-TECH floor are make out of 14G12G press bent sheet and light in heaviness as compare to the conservative centering plate obtainable in the marketplace.
PLOY-TECHfloor forms are easygoing weight sufficient rigidity gives excellent concrete finish, cuts labour cost and gives a perfect solution to slab shuttering problems.
PLOY-TECH floor are make out of 14G12G press bent sheet and light in heaviness as compare to the conservative centering plate obtainable in the marketplace.
PLOY-TECHfloor forms are easygoing weight sufficient rigidity gives excellent concrete finish, cuts labour cost and gives a perfect solution to slab shuttering problems.
The quick action drop head supplied complete with nuts and bolts. Is designed to fit on Cuplok scaffolding.They allow infills and beams to be struck re-used after only 3 or 4 days, leaving the support in position for the remainder of of the curing period of the concrete slab.
The quick action drop head supplied complete with nuts and bolts. Is designed to fit on Cuplok scaffolding.They allow infills and beams to be struck re-used after only 3 or 4 days, leaving the support in position for the remainder of of the curing period of the concrete slab.
POLY–TECHVertical are complete out of 40 NB ‘B’ Class tube verify to 1S 11611239 Pair of cups are produce at 500 mm cc, but cups at 1000 mm cc are obtainable in usual size of 3.0 mtr, 2.5 mtr, 2.0 mtr, 1.5 mtr, 1.0 mtr & 0.5 mtr. imperfect sizes can be supplied on demand.
POLY–TECHVertical are complete out of 40 NB ‘B’ Class tube verify to 1S 11611239 Pair of cups are produce at 500 mm cc, but cups at 1000 mm cc are obtainable in usual size of 3.0 mtr, 2.5 mtr, 2.0 mtr, 1.5 mtr, 1.0 mtr & 0.5 mtr. imperfect sizes can be supplied on demand.
POLY–TECHHorizontals, make out of 48.3 OD scaffold tube verify by IS 11611239 with fake end blade welded at equally ends to tube and are obtainable in length of 2.5 mtr, 2.0 mtr, 1.8 mtr, 1.5 mtr, 1.25 mtr and 1.0 mtr.
POLY–TECHHorizontals, make out of 48.3 OD scaffold tube verify by IS 11611239 with fake end blade welded at equally ends to tube and are obtainable in length of 2.5 mtr, 2.0 mtr, 1.8 mtr, 1.5 mtr, 1.25 mtr and 1.0 mtr.
This grade is designed for helping the formwork & scaffold at lump limits they are obtainable in two sizes of 1.5 mtr & 1.0 mtr lift. It is situated in cup joints.
This grade is designed for helping the formwork & scaffold at lump limits they are obtainable in two sizes of 1.5 mtr & 1.0 mtr lift. It is situated in cup joints.
The Bridging horizontal is produced to make a working place or stage where a obvious span of above 2.5 mtr to 5.0 mtr is necessary by the chief scaffold run.
The Bridging horizontal is produced to make a working place or stage where a obvious span of above 2.5 mtr to 5.0 mtr is necessary by the chief scaffold run.
PLOY-TECH adjuster floor forms are too the vital part of floor form, which is use to evade imperfect slab formwork, thus eliminate of timber in slab formwork.
PLOY-TECH adjuster floor forms are too the vital part of floor form, which is use to evade imperfect slab formwork, thus eliminate of timber in slab formwork.
A weighty duty fork head (U-Head) which provide modification able to 350mm to meet a extensive variety of unreliable height. It is designed to produce considerable bearing places. It has a usual acme thread and obtainable in 32 Ø & 36 Ø.
A weighty duty fork head (U-Head) which provide modification able to 350mm to meet a extensive variety of unreliable height. It is designed to produce considerable bearing places. It has a usual acme thread and obtainable in 32 Ø & 36 Ø.
For utilize in rolling ground situation & where it is necessary for building up for elevation variation when used beneath supports. obtainable in 32 Ø & 36 Ø, changeable length of 350 mm & 450 mm with adjustment by way of screw upto 275 mm & 350 mm correspondingly.
For utilize in rolling ground situation & where it is necessary for building up for elevation variation when used beneath supports. obtainable in 32 Ø & 36 Ø, changeable length of 350 mm & 450 mm with adjustment by way of screw upto 275 mm & 350 mm correspondingly.