Made out of two verticals and one horizontal on top with extra bracing on both vertical along with arrangements of steps for workman for moving upwards through scaffolding. All other arrangementsaresimilar to U-frame.
Made out of two verticals and one horizontal on top with extra bracing on both vertical along with arrangements of steps for workman for moving upwards through scaffolding. All other arrangementsaresimilar to U-frame.
Consists of rigid welded frames of two verticals and two hor izontals. The f rames are interconnected by scissors cross braces in all bays or alternate bays (for top 20 Meters) of scaffolding through pins welded on frames and lockedin positionby split pins.
Cross Braces are supplied in sizes to suit frame spacings of 3, 2.5, 1.5 & 1 M. or any special sizes onrequest.
Heights : 2000, 1500 & 1000 mm Widths : 1800, 1250 & 900 mm
Consists of rigid welded frames of two verticals and two hor izontals. The f rames are interconnected by scissors cross braces in all bays or alternate bays (for top 20 Meters) of scaffolding through pins welded on frames and lockedin positionby split pins.
Cross Braces are supplied in sizes to suit frame spacings of 3, 2.5, 1.5 & 1 M. or any special sizes onrequest.
Heights : 2000, 1500 & 1000 mm Widths : 1800, 1250 & 900 mm
(Heavy Duty) Height-M Safe Axial Load-Kg. Prop Closed Extended Closed Extended 0P 1P 2P 3P 4P 1.10 m 1.50 m 2.00 m 2.00 m 3.00 m 1.75 m 2.75 m 3.25 m 3.75 m 4.65 m 3500 kgs. 3200 kgs. 3000 kgs. 2900 kgs. 2300 kgs. 3000 kgs. 2300 kgs. 2200 kgs. 2000 kgs. 1150 kgs. Note : Props must be braced in both directions by tubes and right angle Couplers at approximately 250 mm above Prop Nut when extended beyond 3.6 metres.
(Heavy Duty) Height-M Safe Axial Load-Kg. Prop Closed Extended Closed Extended 0P 1P 2P 3P 4P 1.10 m 1.50 m 2.00 m 2.00 m 3.00 m 1.75 m 2.75 m 3.25 m 3.75 m 4.65 m 3500 kgs. 3200 kgs. 3000 kgs. 2900 kgs. 2300 kgs. 3000 kgs. 2300 kgs. 2200 kgs. 2000 kgs. 1150 kgs. Note : Props must be braced in both directions by tubes and right angle Couplers at approximately 250 mm above Prop Nut when extended beyond 3.6 metres.
Transom, which replace the tubular horizontals offers a form location for Steel battens. Battens are fitted on these specially designed Omega section thus providing a flatandlevel decking.
Transom, which replace the tubular horizontals offers a form location for Steel battens. Battens are fitted on these specially designed Omega section thus providing a flatandlevel decking.
The 2-board and 3-board Hop-Up Brackets incorporate the Omega Section for location Battens and attach to the cup joints in order that the Hop-Up Brackets are correctly located each unit includes a FAST LOCK Joint to accept a standardHorizontal.
The 2-board and 3-board Hop-Up Brackets incorporate the Omega Section for location Battens and attach to the cup joints in order that the Hop-Up Brackets are correctly located each unit includes a FAST LOCK Joint to accept a standardHorizontal.
Standardunit consists oftwoverticalsandonehorizontal cross bar both of 48.3 mm OD tube. Lugs welded at 500 mm centres on verticals provide positive support to horizontal which has built in three-way clamps welded at two ends to fix ledger tube connecting the units.
Nolooseparts Handy, easy for erection at great heights Easy for storageandtransportation Ideal as access scaffold or support staging since units connected by ledger tubes allow variable spacings.
Standardunit consists oftwoverticalsandonehorizontal cross bar both of 48.3 mm OD tube. Lugs welded at 500 mm centres on verticals provide positive support to horizontal which has built in three-way clamps welded at two ends to fix ledger tube connecting the units.
Nolooseparts Handy, easy for erection at great heights Easy for storageandtransportation Ideal as access scaffold or support staging since units connected by ledger tubes allow variable spacings.
The Following table provides a ready reckoner for determining the span and spacing of Spans giving spacing for various slab thicknesses and spans for M 150 concrete.
The Following table provides a ready reckoner for determining the span and spacing of Spans giving spacing for various slab thicknesses and spans for M 150 concrete.
Consist of rigidwelded framesof two42.4mmODVerticals andone horizontal with knee bracings. These frames are connected by diagonals and horizontals through pins welded to frames and locked in position by split pins
Light yet rigid and economical Ideal as access scaffolding upto 20M Height Easy and quick for erection.
Heights : 2000, 1500 & 1000 mm Widths : 900 mm
Consist of rigidwelded framesof two42.4mmODVerticals andone horizontal with knee bracings. These frames are connected by diagonals and horizontals through pins welded to frames and locked in position by split pins
Light yet rigid and economical Ideal as access scaffolding upto 20M Height Easy and quick for erection.
Heights : 2000, 1500 & 1000 mm Widths : 900 mm
Horizontals are available in a range of Various sizes or can be made to a special length if required. The forged blade end fits in the cup of the Verticals. The simple robust design ensures that Horizontals need no maintenance.
Horizontals are available in a range of Various sizes or can be made to a special length if required. The forged blade end fits in the cup of the Verticals. The simple robust design ensures that Horizontals need no maintenance.
This component is used either as a base plate at the bottom of a jack to give the necessary spread of load or when the jack is used at the top of the Vertical as headPlate.
This component is used either as a base plate at the bottom of a jack to give the necessary spread of load or when the jack is used at the top of the Vertical as headPlate.
VERTICALS/STANDARDS FAST LOCK Verticals are available to suit any propping or access application economically. The Verticals can be used for support or access as required. The connection point is set at 500/1000 mm Vertical intervals for maximum versatility in use. The lower cups are welded in position, the upper, moveable cups are retained by a fixed stop.
VERTICALS/STANDARDS FAST LOCK Verticals are available to suit any propping or access application economically. The Verticals can be used for support or access as required. The connection point is set at 500/1000 mm Vertical intervals for maximum versatility in use. The lower cups are welded in position, the upper, moveable cups are retained by a fixed stop.
The adjustable jack provides a method of adjustment which canbeusedat either the top or bottom of a scaffold support structure. Range : 225mm to 650mmAdj.
The adjustable jack provides a method of adjustment which canbeusedat either the top or bottom of a scaffold support structure. Range : 225mm to 650mmAdj.
The DynamicWedge Lock system of Scaffolding consists of Tubular verticals with wedge housings welded to them at 1000/500mm centres in four directions at right angles. Transoms Ledgers and Diagonals having captive wedges welded to them engage with the wedge housing on vertical and arelocked in positionby lockingwedges.Verticals areerectedonAdjustableBasePlateswhichcopewith variation in ground level.
Ideally suited for ship building and rapidwork sinceworking levels can be changed specially and simply without disturbing main structure of scaffolding. SafeAccess Scaffoldfor building constructionandrepair.Ledgerswhicharenonloadcarryingmemberscanbeused as handrail Most Suited for use as centering for slabs. Dropheads allow early removal formwork, retaining slab support. Rigid interlocking components quickly erectedanddismantledrequiringminimumdiagonal bracing. Excellent to buildin very high scaffolding forchimneyor siloconstruction sinceeachindividualmemberis veryhandyandlightweight.
The DynamicWedge Lock system of Scaffolding consists of Tubular verticals with wedge housings welded to them at 1000/500mm centres in four directions at right angles. Transoms Ledgers and Diagonals having captive wedges welded to them engage with the wedge housing on vertical and arelocked in positionby lockingwedges.Verticals areerectedonAdjustableBasePlateswhichcopewith variation in ground level.
Ideally suited for ship building and rapidwork sinceworking levels can be changed specially and simply without disturbing main structure of scaffolding. SafeAccess Scaffoldfor building constructionandrepair.Ledgerswhicharenonloadcarryingmemberscanbeused as handrail Most Suited for use as centering for slabs. Dropheads allow early removal formwork, retaining slab support. Rigid interlocking components quickly erectedanddismantledrequiringminimumdiagonal bracing. Excellent to buildin very high scaffolding forchimneyor siloconstruction sinceeachindividualmemberis veryhandyandlightweight.