We offer used 2.5 steam turbine. Extraction cum back pressure type steam turbine
inlet steam pressure 62kgcm2
manuf, year 1992
extraction detail
extraction pressure 22kgcm2
extraction quantity 12 tph
back pressure 10.5 kgcm2
back pressure steam quantity is 22 tph
total steam quantity at in let of turbine is 35 tph
in let steam pressure 65kgcm2
presently on the foundation with all electrical s and valves.
...more
Used 2.5 Steam Turbine
8,500,000 / Set
1 Set(s) (MOQ)
We offer used 2.5 steam turbine. Extraction cum back pressure type steam turbine
inlet steam pressure 62kgcm2
manuf, year 1992
extraction detail
extraction pressure 22kgcm2
extraction quantity 12 tph
back pressure 10.5 kgcm2
back pressure steam quantity is 22 tph
total steam quantity at in let of turbine is 35 tph
in let steam pressure 65kgcm2
presently on the foundation with all electrical s and valves.
We are offering thermal power plant equipments.
30 mw coal fired powher plant 2012-13 partly installed not commissioned (unused equipments)
turbine:
make: nanjing turbine & electric machinery group co. Ltd. China
year of manufacture: december 2010
year of installation: 2012 (partly installed but not commissioned)
inlet pressure: 108kgcmsq
exhaust pressure: 0.1 kgcmsq
max steam capacity: 102 tph
temperature: 540 deg c
type: fully condensing.
Alternator
make: nanjing turbine & electric machinery group co. Ltd. China
year of manufacture: december 2010
year of installation: 2012 (partly installed but not commissioned)
capacity: 30 mw
voltage: 11000v
speed:3000rpm
cycle: 50 hz
scope: turbine, gearbox, oil and lub systems, water cooled condenser, ejector, pipes etc. All control panels)
(turbine, gearbox, condenser alternator, control panels are installed on foundations but not commissioned)
boiler
make: ijt
year: 2011-12 (fully installed but not charged)
type: coal fired
capacity: 105 tph
pressure: 110 kgcmsq
temperature: 540 deg c
scope: boiler with auxiliaries, esp, id & fd fans, pumps etc.
We are offering thermal power plant equipments.
30 mw coal fired powher plant 2012-13 partly installed not commissioned (unused equipments)
turbine:
make: nanjing turbine & electric machinery group co. Ltd. China
year of manufacture: december 2010
year of installation: 2012 (partly installed but not commissioned)
inlet pressure: 108kgcmsq
exhaust pressure: 0.1 kgcmsq
max steam capacity: 102 tph
temperature: 540 deg c
type: fully condensing.
Alternator
make: nanjing turbine & electric machinery group co. Ltd. China
year of manufacture: december 2010
year of installation: 2012 (partly installed but not commissioned)
capacity: 30 mw
voltage: 11000v
speed:3000rpm
cycle: 50 hz
scope: turbine, gearbox, oil and lub systems, water cooled condenser, ejector, pipes etc. All control panels)
(turbine, gearbox, condenser alternator, control panels are installed on foundations but not commissioned)
boiler
make: ijt
year: 2011-12 (fully installed but not charged)
type: coal fired
capacity: 105 tph
pressure: 110 kgcmsq
temperature: 540 deg c
scope: boiler with auxiliaries, esp, id & fd fans, pumps etc.