Power Controllers Dealers

(9 products available)
  • Power Factor Correction BR 6000 12o

    Power Factor Correction BR 6000 12o

    Get Price Quote

    • Storage TypeIndoor
    • Operating Temperature-20 ... +60 °C
    • Storage Temperature-20 ... +75 °C
    • Supply Voltage110 ... 230 V AC, 50 And 60 Hz
    • Switching And Discharge Time Range20 ... 1000 Ms
    • Maximum Current5.3 (sinusoidal)
    • Switching Voltage/Power10 ... 24 V DC
    • Characteristics Intelligent control Menu driven handling (plain language) Czech/Dutch/English/French/German/Polish/Portuguese/Russian/ Spanish/Turkish Self-optimizing control capability Large measuring voltage range Recall function of recorded values Four-quadrant operation (e.g. stand by generator) Powerful alarm output Control series editor (value perception selectable) High precision of measurement 2nd expert mode Fixing of net frequency in the expert mode (for measuring) to avoid errors when measuring in critical grids Auto-range-function for sensitivity: For input current
    ...more
  • Power Factor Controller

    Power Factor Controller

    Get Price Quote

    Our well known company is specialized in manufacturing and supplying high quality range of Power Factor Controller that is widely used for enhancing the life of electrical equipment. Our offered controller is available in the market in various models, dimensions and other technical specifications as per the demands of our esteemed clients. Our quality experts test its quality on several parameters before the final dispatch. Apart from this, our valued clients can avail it from us at affordable rates.The power factor controller PFR-X calculates the actual and reactive power in the mains from the measured current and voltage. It also determines if actual power is being consumed or delivered. It identifies the power of the connected capacitor stages and connects or disconnects them in an optimized manner as required by the actual mains conditions. The regulation considers the frequency of changes in the reactive load and follows the principle of rotational switching. This guarantees that optimum power factor correction is achieved with the minimum number of switching operations.The integrated digital display can show the actual power factor, the mains frequency, the actual tariff, the programmed target power factor, the connected capacitor power.The PFR-X is ready for operation with its preset functions immediately after installation without any modifications or adjustments. Available with 6 or 12 outputs.Features: High capacity Easy to install Low maintenance
    ...more
  • Automatic Power Factor Controller

    Automatic Power Factor Controller

    Get Price Quote

    • MOQ1 Piece(s)
    • Size700x500x300 mm
    • Automatic GradeAutomatic
  • Thyristor Controllers

    Thyristor Controllers

    Get Price Quote

    • Rated Voltage440/1-3 Phase/50Hz.
    • Operating voltage110/240/440V/1-3 Phase/50Hz
    • Controller CurrentIN/5 Amp or IN/1 Amp. Single CT sensing.
    • APFC Relay4 Stage APFC Relay with bank on/off LED Indication with measurement & calculations of all Electric
    • Switching ElementThyristor Modules.
    • ProtectionsMCB/HRC FUSES To each Bank, With in built protections of APFC Controller.
    • Operating modesAuto, Manual, Program, Standby mode.
    • LOAD OPERATED FAST RESPONSE REACTIVE POWER COMPENSATION SYSTEM :- . The system is designed to work automatically on highly variable, fluctuating, unbalanced loads. The compensation is done on percentage of load current set able on site in program mode of Controller with fast response with cut off of set value of power factor. Load operated Thyristor switched Automatic power factor system mainly suitable to Welding Loads, Lifts, Crane, Injection Molding Machines. It is a highly Fast response system properly designed to measure ,display, connect & disconnect the required Kvar Capacitors to achieve target power factor.     Load operated APFC RELAY -Microprocessor based, most advanced device to measure & Display all electrical network parameters & calculate load Kvar to work automatically to connect & disconnect capacitors banks to achieve target power factor with ultra fast response.   Display Parameters of APFC Relay:   Voltage, Current, Power Factor, Active Power (KW), Apparent Power (KVA) -All at LT side Reactive Power (KVAR), Capacitive Reactive Power (KVAR) Active Energy (KWH), Apparent Energy ( Energy (KVAH), Reactive Energy(KVARH) Real Time, date, Network fault message display Capacitor bank status display,Load sideParameters viz. Current, P.F. & KVA. Protection :            Controller offers protections in the following situations,          High voltage , Low voltage, Over-load, Under load, Imbalance, Load Current          Imbalance, Over Capacitor Current, Capacitor Current Imbalance, Over Temperature   Programmable Parameters of APFC Relay: Target Power Factor - 0.90 lead to 0.85 lag. Time Delay (TD) - 0.5 mili sec - 120 Sec. CT Ratio - Current Transformer ratio to measure actual load. PT Ratio - Potential Transformer ratio to measure actual voltage. No. of Steps - 1 to 4 Capacitor steps. Capacitor Step Rating -on percentage of load current with connected Kvar. Display Scroll time delay. Capacitor's discharge time in Seconds. Compensation mode - fine-Avarage /minimum/maximum of load Kvar basis.
    ...more
  • Real Time Power Factor Correction Controllers

    Real Time Power Factor Correction Controllers

    Get Price Quote

    Real Time Power Factor Correction Controllers, Street Lighting Controller
  • Power Factor Controller

    Power Factor Controller

    5,000 - 9,000 / NOS

    Power Factor Controlle
  • Power Factor Controller

    Power Factor Controller

    Get Price Quote

    Power Factor Controller, Neutral Displacement Relay, Digital Read out Uni
  • Power Controllers

    Power Controllers

    Get Price Quote

    Power Controllers, Electrical Panels, Industrial Control Cente
  • Power Factor Controller

    Power Factor Controller

    Get Price Quote

    Power Factor Controller, Screw Chiller, Refrigerated Air Drye
Filter by Locality
top